PROJECTS

Test survey in Downham Market to show customers what a drainage report would look like and the drainage mapping.
Survey
%20(1).jpeg)
Package treatment plant instal with a drainage.
Package Treatment Plant
.jpeg)
This is some new foul waste drains installed for a customer in Barroway Drove to solve a backflow issue.
New Pipework

Soakaway installation at at new build property. All calculated for correct VP number along with a percolation test.
Soakaway

New foul waste drains installed for a new extension at a private residence, along with new surface water pipework and soakaway.
New Pipework + Soakaway

Surface water pipework installation, along with soakaway, foul waste pump chamber and underground pipework, designed to the property and connected to the main drains.
Soakaway + Pumped Foul Waste